https://www.miningweekly.com

Kinross Gold takes multibillion-dollar net loss on mine write-down

14th February 2013

By: Henry Lazenby

Creamer Media Deputy Editor: North America

  

Font size: - +

TORONTO (miningweekly.com) – Canadian gold miner Kinross Gold on Wednesday reported a multibillion-dollar net loss for the fourth quarter after taking a $3.2-billion impairment charge mostly related to its Tasiast mine, in Mauritania, which outweighed an increase in revenue.

The miner said the net loss included an after-tax noncash impairment charge of $3.2-million, of which the Tasiast project represented $3.09-billion.

Kinross in 2010 acquired the mine in a blockbuster $7.1-billion acquisition of Redback Mining.

In December 2011, however, the miner took a $2.9-billion impairment hit for Tasiast and the Chirano gold mine, in Ghana, which it acquired in the same transaction.

Kinross reported a net loss of $2.98-billion or $2.62 a share for the fourth-quarter ended December 31, compared with a net loss of $2.79-billion or $2.45 a share in the same quarter a year earlier.

For the full year, the company’s net loss was $2.5-billion or $2.24 a share, compared with a loss of $2.09-billion or $1.84 a share for full-year 2011.

When one-time items were removed, the company reported adjusted earnings of $276.5-million or 24c a share for the fourth quarter, compared with $187.2-million or 16c a share a year earlier. This was higher than the 22c a share analysts had expected on average.

Adjusted net earnings for the full year were $879.2-million or $0.77 a share, compared with $850.8-million, or 75c a share for full-year 2011.

The company reported its revenue for the quarter improved by 29% to $1.19-billion, compared with $919.8-million during the same period in 2011, mainly owing to increased production and a higher realised gold price. Analysts had expected $1.15-billion in revenue for the quarter.

Full-year revenue increased by 12% to a record $4.3-billion, compared with $3.8-billion a year earlier.

The average realized gold price was $1 707/oz in the quarter, compared with $1 598/oz year-on-year. The average realised gold price was $1 643/oz for full-year 2012, versus $1 500/oz for full-year 2011.

Kinross produced 724 510 attributable gold-equivalent ounces (GEO) in the fourth quarter, a 16% increase over the fourth quarter of 2011, mainly owing to production increases at Fort Knox, in Alaska, and La Coipa, in Chile.

Full-year production was 2.61-million GEO, which was more than the best-case 2.6-million GEO the company had expected in the year. The company produced 2.5-million ounces in 2011. The full-year production increase was mainly owing to stronger production at Fort Knox.

The production cost of sales per gold-equivalent ounce was $686 for the fourth quarter, compared with $635 for the fourth quarter of 2011, owing mainly to higher input costs for energy, labour and consumables.

Production cost of sales for full-year 2012 was $706, in line with the company's guidance of $690 to $725 per gold-equivalent ounce, and compared with $592 for full-year 2011. The increase was mainly a result of higher input costs for labour, energy and consumables and the increase in the processing of lower-grade ore.

Kinross expects to produce about 2.4-million to 2.6-million GEO at production costs of between $740 and $790 a GEO. It expects total capital expenditures of about $1.6-billion this year, about $325-million less than in 2012.

Kinross’ New York-listed shares closed down 1.25% at $7.89 apiece on Wednesday.

Edited by Creamer Media Reporter

Comments

Showroom

Weir Minerals Africa and Middle East
Weir Minerals Africa and Middle East

Weir Minerals Europe, Middle East and Africa is a global supplier of excellent minerals solutions, including pumps, valves, hydrocyclones,...

VISIT SHOWROOM 
Environmental Assurance (Pty) Ltd.
Environmental Assurance (Pty) Ltd.

ENVASS is a customer and solutions-driven environmental consultancy with established divisions, serviced by highly qualified and experienced...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.099 0.133s - 90pq - 2rq
1:
1: United States
Subscribe Now
2: United States
2: