https://www.miningweekly.com
Botswana|Copper|Resources|Drilling
Botswana|Copper|Resources|Drilling
botswana|copper|resources|drilling

Kavango starts drilling in Botswana

15th October 2019

By: Tasneem Bulbulia

Senior Contributing Editor Online

     

Font size: - +

LSE-listed Kavango Resources has started drilling at the first of its three targets in the Kalahari Suture Zone (KSZ) in Botswana.

The objective of the drilling is to verify the company’s geological model, aimed at discovering a Norilsk-style magmatic sulphide orebody.

The company selected its current three drill targets following two airborne electro-magnetic (AEM) surveys on its prospecting licences and the subsequent ground-based geophysical follow-up surveys and soil sampling. The soil sampling tested for iron, copper and zinc.

The about 1 000 m drilling programme will seek to intersect sulphide mineralisation associated with gabbroic sills that were intruded into the Karoo sediments about 180-million years ago.

Kavango believes the presence of copper/nickel sulphide mineralisation, in association with high-level gabbroic sills, will provide significant evidence for the development of magmatic sulphide orebodies similar to those currently being mined at Norilsk, in Russia, and Voisey’s Bay, in Canada.

Kavango has elected to use reverse circulation drilling, which is more cost effective, to penetrate the relatively unconsolidated Kalahari and Karoo cover for up to 200 m.

Diamond core drilling will then continue into Karoo sediments, gabbros and the conductive targets to a target depth of around 400 m.

“We are delighted that the drilling on the first hole of this three-hole programme is now under way.

“If the current drilling is able to verify Kavango's geological model by intersecting metal sulphide mineralisation in association with gabbroic intrusives on the KSZ, this will represent a major step forward towards the discovery of a world-class, Norilsk-type, magmatic sulphide deposit in Botswana,” Kavango CEO Michael Foster commented in a statement issued on Tuesday. 

Edited by Chanel de Bruyn
Creamer Media Senior Deputy Editor Online

Comments

Projects

Location map of the Antler copper project
Antler copper project, US – update
Updated 1 hour 48 minutes ago By: Sheila Barradas

Showroom

John Deere (Pty) Ltd
John Deere (Pty) Ltd

In 1958 John Deere Construction made its first introduction to the industry with their model 64 bulldozer.

VISIT SHOWROOM 
AutoX
AutoX

We are dedicated to business excellence and innovation.

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.07 0.102s - 109pq - 2rq
1:
1: United States
Subscribe Now
2: United States
2: