Kabila yet to sign new mining code as deadline nears
DAKAR – Democratic Republic of Congo's President Joseph Kabila has not yet signed into law a new mining code, a senior aide said on Tuesday, as international mining companies wage a last-ditch lobbying effort against the measure.
The comments by Jean-Pierre Kambila, Kabila's deputy chief of staff, come amid uncertainty about whether the president intends to sign the new code, which raises taxes on miners, or whether he might let the bill become law without his signature.
Under the constitution, the president has 15 days from the time Parliament sends him the bill to either sign it into law or return it to parliament for further deliberation. If he takes no action, the bill automatically becomes law.
It is unclear what day the president received the bill from parliament but Mines Minister Martin Kabwelulu said at a conference on February 7 that the code was "with the President".
That would give Kabila until Thursday at the latest to act. Asked about this, Kambila told Reuters: "The law has not been promulgated. That's all I can tell you."
International mining companies in Congo, Africa's largest copper producer, include Randgold, Glencore, China Molybdenum and Ivanhoe.
They are lobbying Kabila not to sign the new code, saying the proposed changes would discourage investment and violate existing agreements. Randgold has threatened to challenge the law through international arbitration.
The code could see royalties on cobalt, a vital component in electric car batteries, increase five-fold to 10% and it removes a stability clause in the current law protecting miners from changes to the fiscal and customs regime for 10 years.
Congo is the world's biggest source of cobalt, of which its output jumped 15.5% last year to 73 940 t.
Comments
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation