https://www.miningweekly.com
Surface|Drilling|Bearing
Surface|Drilling|Bearing
surface|drilling|bearing

IronRidge to start drilling at Ghana lithium deposit

17th April 2018

By: Marleny Arnoldi

Deputy Editor Online

     

Font size: - +

JOHANNESBURG (miningweekly.com) – Aim-listed IronRidge Resource has received the necessary approvals and earthworks have started for drill access and drill pads over its Ewoyaa pegmatite deposit, in Ghana.

Earthworks are expected to take between two and three weeks to complete.

The company plans to undertake about 7 000 m of reverse circulation and diamond drilling for up to 60 holes over two phases, starting in late April or early May.

Ewoyaa’s geology comprises three well-defined pegmatite zones with a combined 1 600 m strike length, with the largest single spodumene-bearing pegmatite being over 800 m long and up to 90 m wide at surface.

IronRidge previously reported high-grade lithium results at Ewoyaa from surface trenching, including 65 m at 1.1% lithium, 25 m at 1.62% lithium, 18 m at 1.75% lithium, and 4.5 m at 2.2% lithium.

IronRidge CEO Vincent Mascolo said the approvals to start earthworks and drilling is the next crucial step in confirming Ewoyaa as a significant lithium discovery.

Edited by Chanel de Bruyn
Creamer Media Senior Deputy Editor Online

Comments

Showroom

Environmental Assurance (Pty) Ltd.
Environmental Assurance (Pty) Ltd.

ENVASS is a customer and solutions-driven environmental consultancy with established divisions, serviced by highly qualified and experienced...

VISIT SHOWROOM 
Booyco Electronics
Booyco Electronics

Booyco Electronics, South African pioneer of Proximity Detection Systems, offers safety solutions for underground and surface mining, quarrying,...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

PGMs and green hydrogen make headlines
PGMs and green hydrogen make headlines
19th April 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.228 0.269s - 110pq - 2rq
1:
1: United States
Subscribe Now
2: United States
2: