Name and Location
Impala No 17 Shaft project, Rustenburg, North West, South Africa.

Client
Impala Platinum (Implats).

Project Description
Implats' No 17 Shaft project consists of three new vertical shafts at the company's Rustenburg operation to replace production from its older shafts that are nearing the end of their productive life.

Value
R11.1-billion.

Duration
Ramp-up to full production of 225 000 t/m of platinum-bearing rock is scheduled to begin in 2017.

Latest Developments
Implats reports in its consolidated interim results for the six months ended December 2012 that sinking at the 17 Shaft complex remains on target.

Key Contracts and Suppliers
TWP (engineering, procurement and construction management contract); Scribante (earthworks); Murray & Roberts (civils); Shaft Sinkers (ventilation, main and refrigeration shafts); Louwill Engineering (building structures); NIC Electrical & Instrumentation Construction (C&I); Grinaker-LTA (shaft headgear erection contract); DRA Technical Services, ABB, Siemag Tecberg, Coilmec, Actom, Siemens and Winder Controls (supply of winders for the project); BBE Projects (turnkey design, construction and commissioning of the refrigeration plant and air cooler system); and Johnson Controls, subcontracted by BBE Projects (supply of chiller system).

On Budget and on Time?
The project is on schedule and below budget, while still achieving a high-quality finish, and should be completed in 2017.

Contact Details for Project Information
Impala No 17 Shaft GM Jacques Pretorius, cell + 27 82 801 2987; or Impala No 17 Shaft project manager Jacey Kruger, cell +27 82 801 1232.
BBE Projects, tel +27 11 706 9800, fax +27 11 706 6931 or email bbe@bbe.co.za.
Grinaker-LTA corporate affairs, tel +27 11 578 6000, fax +27 11 578 6161 or email enquiry@grinaker-lta.co.za.
Impala No 17 Shaft project manager Jacey Kruger, cell +27 82 801 1232.
Johnson Controls Systems & Services public relations manager Nanda Aerts, tel +32 2 709 4481 or email Nanda.Aerts@jci.com.
Louwill Engineering, tel +27 11 818 5186 or email ben@louwill.co.za.
Murray & Roberts, tel +27 11 456 6200, fax +27 11 455 2222 or email info@murrob.com.
NIC Electrical & Instrumentation Construction, tel +27 11 386 5000, fax +27 11 786 6786 or email engineering@nicinst.co.za.
Shaft Sinkers, tel +27 11 445 4300, fax +27 11 444 4410 or email sinkers@shaftsinkers.co.za.
TWP, Don Munro, cell +27 82 658 0116.

Edited by Creamer Media Reporter

Comments

Showroom

VEGA Controls SA (Pty) Ltd
VEGA Controls SA (Pty) Ltd

For over 60 years, VEGA has provided industry-leading products for the measurement of level, density, weight and pressure. As the inventor of the...

VISIT SHOWROOM 
Schauenburg SmartMine IoT
Schauenburg SmartMine IoT

SmartMine IoT has been developed with the mining industry in mind, to provides our customers with powerful business intelligence and data modelling...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

PGMs and green hydrogen make headlines
PGMs and green hydrogen make headlines
19th April 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.112 0.15s - 90pq - 2rq
1:
1: United States
Subscribe Now
2: United States
2: