Image places A$52m price tag on WA mineral sands project
PERTH (miningweekly.com) – The Boonanarring/Atlas mineral sands project, in Western Australia, will require a capital investment of about A$52-million to develop, ASX-listed Image Resources reported on Tuesday.
A bankable feasibility study (BFS) estimated that the Boonanarring deposit would deliver some 1.1-million tonnes of heavy mineral concentrate while the Atlas deposit would deliver an additional 711 000 t.
The Boonanarring deposit is estimated to have an initial mine life of five years, after which mining would move to the Atlas deposit, which would add a further three years to the overall mine life. However, Image said on Tuesday that there was opportunity to extend the mine life from a confirmed extension area of high-grade mineralisation to the north of Boonanarring that was within economic pumping distance of the planned location of the wet concentrator plant.
Image told shareholders that the company had secured an offtake agreement for 100% of the heavy mineral concentrate to be produced over the life of the project, with pricing to be based on then-current relevant market prices.
At current prices, the combined project is estimated to generate revenues of about A$793-million, with the BFS estimating a pre-tax net present value of A$135-million and an internal rate of return of 64%.
Image is hoping to secure project funding by the third quarter of this year, allowing construction to start, followed by commissioning and first production in the first quarter of 2018.
In the meantime, the company will continue to review the capital and operating costs of the Boonanarring/Atlas project, to determine the possibility of reducing overall costs.
Comments
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation