https://www.miningweekly.com

Hernic’s improved performance in October sets pace for Q4

20th November 2017

By: Megan van Wyngaardt

Creamer Media Contributing Editor Online

     

Font size: - +

JOHANNESBURG (miningweekly.com) – The performance of dual-listed Jubilee Platinum’s Hernic operations improved significantly in October, with 45 596 t of material processed to produce 1 427 oz of platinum-group metals (PGMs) – a 22% month-on-month increase.

Jubilee noted that this was in line with the company’s current focus on process optimisation as part of the final phase of the project execution. Jubilee expects to achieve a further milestone in operational performance during the fourth quarter, with the increase in feed material to the processing plant.

"The Hernic project continues to deliver excellent results as we step up the throughput during the final optimisation of the operation. Our October results illustrate the significant improvement in operational performance during this optimisation phase which we expect to continue over the next quarter,” said CEO Leon Coetzer.

He added that he was particularly pleased by the earnings margin the project was already achieving, with a unit cost of only $406/oz, making the Hernic project one of the lowest-cost PGM producers in the industry.

Project earnings during the month also increased by 47% to R6.65-million.

Edited by Chanel de Bruyn
Creamer Media Senior Deputy Editor Online

Comments

Showroom

Hanna Instruments Image
Hanna Instruments (Pty) Ltd

We supply customers with practical affordable solutions for their testing needs. Our products include benchtop, portable, in-line process control...

VISIT SHOWROOM 
Goodwin Submersible Pumps Africa (Pty) Ltd
Goodwin Submersible Pumps Africa (Pty) Ltd

Goodwin Submersible Pumps Africa is sole distributors for Goodwin electrically driven, submersible, abrasion resistance slurry pumps.

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Resources Watch
Resources Watch
17th April 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.141 0.177s - 105pq - 2rq
1:
1: United States
Subscribe Now
2: United States
2: