https://www.miningweekly.com

Gascoyne extends Dalgaranga mine life

16th November 2017

By: Esmarie Iannucci

Creamer Media Senior Deputy Editor: Australasia

     

Font size: - +

PERTH (miningweekly.com) – Gold developer Gascoyne Resources has added ounces to its Dalgaranga project, in Western Australia, which could extend gold production to beyond the planned six years.

The ASX-listed miner on Thursday announced that the mine plan for the Dalgaranga project had been updated to include the recently discovered Sly Fox deposit, as well as a redesign of the Gileys pit and an update of the Golden Wings mineral resource.

The new mine plan now incorporated about 652 000 oz of contained gold, up from the 592 500 oz considered in Dalgaranga’s feasibility study.

Gascoyne pointed out that the new mine plan included an increase of about one-million tonnes of ore over the previous mine plan, which would allow the company to use the excess plant capacity for the first two years of production, while also deferring waste movement and extending the mine life to beyond six years.

The deferral of waste movement would remove about A$20-million of cost out of the first two years of operation, while yearly production will remain effectively unchanged.

Gascoyne is in the midst of constructing a 2.5-million-tonne-a-year processing plant at Dalgaranga, with mining expected to start in March next year. The project is expected to produce about 100 000 oz/y of gold.

The company on Thursday told shareholders that it had fast-tracked development activities for the upper portions of the Sly Fox discovery to maximise plant throughput, following recognition that the 2.5-million-tonne-a-year plant had the capacity to treat up to 3-million tonnes a year of oxide ore.

Edited by Mariaan Webb
Creamer Media Senior Deputy Editor Online

Comments

Showroom

SAIMC (Society for Automation, Instrumentation, Mechatronics and Control)
SAIMC (Society for Automation, Instrumentation, Mechatronics and Control)

Education: Consulting with member companies to obtain the optimal benefits from their B-BBEE spending, skills resources as well as B-BBEE points

VISIT SHOWROOM 
Immersive Technologies
Immersive Technologies

Immersive Technologies is the world's largest, proven and tested supplier of simulator training solutions to the global resources industry.

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Resources Watch
Resources Watch
17th April 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.097 0.137s - 88pq - 2rq
1:
1: United States
Subscribe Now
2: United States
2: