Further Trading Statement For The Six Months Ended 31 December 2018
Implats will release results for the half year ended 31 December 2018 (“the period”) on 28 February 2019.
Implats issued a trading statement on 4 February 2019 indicating that both headline earnings and basic earnings were expected to be at least R2.100 billion for the period. Implats indicated that headline earnings per share (HEPS) and basic earnings per share (EPS) for the period would be at least 292 cents per share.
At that time, there was not sufficient certainty to provide specific guidance ranges, as required by the JSE Listing Requirements, for the expected results. Implats now has reasonable certainty about the earnings and therefore advises shareholders of the following expected earnings ranges.
Implats’ headline earnings and HEPS for the period are expected to be between R2.213 billion and R2.243 billion and between 308 cents and 312 cents per share, respectively. Headline loss and headline loss per share for the six months ended 31 December 2017 (“comparative period”) were R150 million and 21 cents per share, respectively.
Basic earnings and EPS are expected to be between R2.290 billion and R2.322 billion and between 319 cents and 323 cents per share, respectively, compared to a basic loss and a basic loss per share of R163 million or 23 cents for the comparative period, respectively.
As indicated in the trading statement issued on 4 February 2019, the improvement in safety and operational performances, particularly at the Impala Rustenburg operations, higher sales volumes and higher rand platinum group metals basket prices ‐ due primarily to the weakening of the rand ‐ were the major reasons for the increase in earnings.
The financial information on which this trading statement is based has not been reviewed and reported on by the external auditors of Implats.
Comments
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation