EPA approves expanded Wiluna plan
PERTH (miningweekly.com) – The Western Australian Environmental Protection Authority (EPA) has approved the environmental scoping document for the Wiluna project extension, developer Toro Energy reported on Wednesday.
Under the expansion project, Toro would integrate the Millipede and Lake Maitland deposits into its Wiluna project. The extended Wiluna project would still be based on a central processing plant, as currently approved by the government, adjacent to the Centipede/Millipede deposits.
This would reduce the regional footprint and environmental impacts by avoiding duplication of operations and infrastructure across multiple deposits.
Based on mining at the four deposits, the Wiluna project was expected to have a mine life of 16 years with average production of two-million pounds a year of uranium oxide (U3O8), for the first ten years of operation.
Total production over the life-of-mine would reach 30.2-million pounds of U3O8.
Toro MD Vanessa Guthrie said on Wednesday that the EPA approval of the environmental scoping document would allow Toro to continue with its preparations of the public environmental review (PER) - the next step in the assessment process.
“The EPA has determined that the PER should be open for public review for a 12-week period and Toro is planning to release this document by mid-2015,” Guthrie said.
Comments
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation