https://www.miningweekly.com

Diamcor starts expanding Krone-Endora at Venetia project

Diamcor starts expanding Krone-Endora at Venetia project

Photo by Duane Daws

5th February 2015

By: Henry Lazenby

Creamer Media Deputy Editor: North America

  

Font size: - +

TORONTO (miningweekly.com) – After successfully closing a C$3.13-million private placement in December, project developer Diamcor Mining has started expanding the mining facilities at its Krone-Endora at Venetia project, in South Africa’s Limpopo province, located directly next to De Beers’ Venetia diamond mine – the country’s largest precious gems mine.

TSX-V-listed Diamcor explained on Thursday that owing to the nature of the deposit, one of its main objectives was to design and develop the project's in-field dry-screening plant, necessary to efficiently remove fine material under 1 mm in size.

As a result of extensive testing and development, the in-field dry-screening plant now met company expectations and cleared the way to buy and deploy infrastructure necessary to process larger material in the +26 mm size fractions which, to date, had been stockpiled.

The Canadian junior noted that the upgrades were also designed to improve efficiencies when recovering all material sizes.

The infrastructure upgrades included expanding the project's X-ray final recovery systems, installing more processing equipment to boost crushing and ore liberation in the larger-size fractions and deploying larger heavy equipment.

Diamcor expected the expansion to be completed in the second calendar quarter this year.

Further, funding partner Tiffany & Co Canada had agreed to defer and extend all of the principal and interest payments on loans, effective from December 1. The outstanding balances would continue to accrue interest until payments of both principal and interest restarted in January 2016.

During Diamcor’s third financial quarter ended December 31, it continued to work on preparing an update of its initial National Instrument 43-101-compliant technical report.

The company planned to expand trial mining and processing of all material size fractions from deposits in the K1 area of the project, once it had updated its mineral resource estimate and had completed the current operation’s expansions. Information gleaned from these activities would be used to file further compliant technical reports and to assist the company in developing its operational strategy for the project.

Edited by Tracy Hancock
Creamer Media Contributing Editor

Comments

Showroom

Werner South Africa Pumps & Equipment (PTY) LTD
Werner South Africa Pumps & Equipment (PTY) LTD

For over 30 years, Werner South Africa Pumps & Equipment (PTY) LTD has been designing, manufacturing, supplying and maintaining specialist...

VISIT SHOWROOM 
Goodwin Submersible Pumps Africa (Pty) Ltd
Goodwin Submersible Pumps Africa (Pty) Ltd

Goodwin Submersible Pumps Africa is sole distributors for Goodwin electrically driven, submersible, abrasion resistance slurry pumps.

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.162 0.196s - 90pq - 2rq
1:
1: United States
Subscribe Now
2: United States
2: