TORONTO (miningweekly.com) – Toronto-listed Copper Mountain Mining on Thursday said it had produced about 57-million pounds of copper from its namesake mine in the south of British Columbia during 2012, below its September full-year guidance of 60-million pounds.
However, Laurentian Bank Securities metals and mining analyst Christopher Chang in a note to clients said copper production of 14.2-million pounds was 8% below the expectatiopn of 15.4-million pounds, and silver production of 67 000 oz was 14% below the expectation of 77 700 oz, as mill throughput and implied grades were lower than expected.
“However, based on 2012 total mill throughput of 9.4-million tons, average copper grade of 0.34%, and production of 57-million pounds (of copper), we estimate the company’s 2012 copper recovery to be 80%, implying an impressive Q4/12 recovery rate of 88%. This is materially above our estimate of 78%,” he said, motivating him to maintain a ‘buy’ recommendation on the company’s stock and a target price of $5.25 a share.
The miner said it had shipped about 59-million pounds of copper, 20 000 oz of gold, and 402 000 oz of silver during 2012, which generated an estimated $247-million in revenue. Since the first shipment of concentrate in September 2011 the mine makes a shipment a month to the smelters in Japan.
Copper Mountain said it mined the Pit 2 and Pit 3 areas and averaged about 170 000 t/d. During 2012, a total of 55-million tons of material were mined, including 12.5-million tons of ore and 42.5-million tons of waste. The expected life-of-mine strip ratio is 2:1, but would be higher in the early years.
The company expects to produce about 80-million pounds of copper this year at a total cash cost of between $1.80/lb and $2/lb of copper net of precious metal credits. The miner expects to produce about 35 000 oz of gold and 315 000 oz of silver this year.
The company’s stock took a beating on the lower-than-expected production results, trading 4.26% lower on the TSX on Thursday at C$3.82 apiece.
Comments
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation