https://www.miningweekly.com

Constantine assembles team for Alaska project PEA

30th August 2018

By: Creamer Media Reporter

     

Font size: - +

TSX-V-listed Constantine Metal Resources has selected engineering, project and construction management firm JDS Energy and Mining to prepare a preliminary economic assessment (PEA) of the potential viability of the mineral resources at the Palmer copper/zinc/gold/silver project, in south-east Alaska.

The company has also appointed engineering, geoscience and environmental consulting firm Klohn Crippen Berger for the water and waste management design components. 

Palmer is a high-grade volcanogenic massive sulphide-sulphate (VMS) project, with an inferred mineral resource of 8.1-million tonnes grading 1.41% copper, 5.25% zinc, 0.32 g/t gold and 31.7 g/t silver. 

The resource was last estimated in May 2015 and a new resource estimate is currently under way, which will form the basis of the PEA.

Mineralisation at Palmer occurs within the same belt of rocks that is host to the Greens Creek mine, one of the world’s richest VMS deposits.

The project is being advanced as a joint venture between Constantine (51%) and Dowa Metals & Mining (49%), with Constantine as operator. 

Edited by Mariaan Webb
Creamer Media Senior Deputy Editor Online

Comments

Showroom

Condra Cranes
Condra Cranes

ISO-certified Condra manufactures overhead cranes, portal cranes, cantilever cranes and crane components: hoists, drives, end-carriages, brakes and...

VISIT SHOWROOM 
Rittal
Rittal

Rittal is a world leading provider of top-quality integrated systems for enclosures, power distribution, climate control, IT infrastructure and...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

PGMs and green hydrogen make headlines
PGMs and green hydrogen make headlines
19th April 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.263 0.298s - 90pq - 2rq
1:
1: United States
Subscribe Now
2: United States
2: