GOLD 1555.24 $/ozChange: -26.81
PLATINUM 1426.50 $/ozChange: -33.00
R/$ exchange 8.41Change: -0.18
R/€ exchange 10.62Change: -0.08
 
We have detected that the browser you are using is no longer supported. As a result, some content may not display correctly.
We suggest that you upgrade to the latest version of any of the following browsers:
         
close notification
powered by
Advanced Search
 
 
 
Home
 
Company Announcements
 
 
ILUKA RESOURCES
Company Announcement: Iluka's Murray Basin Stage 2 project at Kulwin, Victoria has achieved first production of heavy mineral concentrate (“HMC”).
 
13th October 2009
TEXT SIZE
Text Smaller Disabled Text Bigger
 

Attached please find a press release on: Iluka Resources Limited ("Iluka") announced that its Murray Basin Stage 2 project at
Kulwin, Victoria has achieved first production of heavy mineral concentrate ("HMC").

FULL Access to Mining Weekly and Engineering News - Subscribe Now!
Subscribe Now Login
 
 
Topics in this article