Chile's SQM seeks approval for $450m lithium plant expansion
SANTIAGO – Chilean miner SQM on Wednesday began the process of seeking government approval for a $450-million expansion of its lithium carbonate plant, which could more than double its production as demand rises for the key element in the manufacturing of batteries.
SQM said in an environmental impact statement that the upgrade planned for its Salar del Carmen facility would increase production of lithium carbonate to 180 000 t/y from 70 000 t/y through two phases with the goal of being operational in 2020.
Global manufacturers of batteries and electric cars are looking to secure their supplies against the increasing value of lithium.
"In the first operational phase, production will be increased to 110 000 t/y by increasing the current operating capacity of our equipment and processes," said the miner.
The company said the second phase of expansion - called Lithium Carbonate Plant 3 - would see new equipment installed and existing equipment modified to increase production.
In January, the company entered into an agreement with the Chilean government that ended a long dispute over a key lithium deposit and enabled it to increase its production quota in the vital Salar de Atacama.
SQM said one the most important aspects of its expansion project would be to optimize its use of scarce water resources in the area of northern Chile where it operates by using the same amount it does now even with increased production levels.
The company plans to begin the lithium plant project at the end of this year.
Comments
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation