Centerra to publish new Mt Milligan technical study next month
Canadian gold miner Centerra said on Tuesday that it would publish its updated technical study for the Mount Milligan gold/copper mine, in British Columbia, by late next month.
The miner is busy with a “comprehensive” technical review of the mine, which had operated at reduced capacity in recent years, owing to water issues.
Centerra said that while the extent of any chance in mineral reserves and resources could not be precisely determined until all the studies and modelling were completed, it noted that Mount Milligan’s mineral resources and reserves would likely “materially reduce, with a resultant effect on the mine life”.
At December 31, 2018, the mine had proven and probable reserves of 447.56-million tonnes at 0.186% copper and 0.3 g/t gold for about 1.8-billion tonnes of copper and 4.74-million ounces of gold.
Mount Milligan is one of three flagship assets in the Centerra portfolio, the others being the Kumtor mine, in Kyrgyzstan and the other the new Oksut gold mine, in Turkey. The company also owns the late-stage Kemess development project in British Columbia.
In 2019, the company exceeded its consolidated gold production guidance, delivering more than 783 000 oz of gold. Gold production in the fourth quarter was 194 507 oz, including 148 523 oz of gold produced by the Kumtor mine and 45 984 oz of gold produced by the Mount Milligan mine.
Copper production of 18.1-million pounds in the fourth quarter and 71.1-million pounds for the full year was within guidance range.
Given the actual gold production, Centerra said its all-in sustaining costs (AISC) per ounce sold were expected to be below the lower end of its 2019 guidance range of $713/oz to $743/oz.
For 2020, the miner is estimating consolidated gold production to be in the range of 740 000 oz to 820 000 oz and 80-million to 90-million pounds of payable copper production from Mount Milligan. This reflects the addition of Öksüt gold production as it ramps up during the year.
Centerra’s consolidated AISC on a by-product basis for 2020 is expected to be in the range of $820/oz to $870/oz. The start of operations at the lower cost Öksüt operation is expected to favourably impact on company-wide AISC in 2020.
The miner’s copper production guidance of 80-million to 90-million pounds reflects expectations that Mount Milligan Mine will operate with no mill water constraints for the entire year.
Comments
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation