Bloom Lake iron-ore project, Canada
Name of the Project
Bloom Lake iron-ore project.
Location
Bloom Lake is located near Fermont, in north-eastern Quebec, Canada.
Client
Quebec Iron Ore (QIO), a subsidiary of Champion Iron.
Project Description
Bloom Lake has total proven and probable reserves of 411.71-million tonnes grading 30.01% iron; and measured and indicated resources of 911.6-million tonnes grading 25.6% iron.
A feasibility study completed on the project has shown that restarting iron-ore mining operations is financially viable and would be competitive in global iron-ore markets, with the potential to be one of the region’s leading long-life iron-ore mines.
Restarting operations is based on different operating assumptions, which include an upgrade to the concentrator plant and a mineral reserve and mining scenario updated for the current iron-ore market.
The operation comprises a conventional surface mining method –incorporating electric hydraulic shovels and mine trucks using an owner mining approach. All major mine equipment required for the restart of the mine is on site, as this equipment is among the assets bought by the company’s subsidiary, QIO.
Jobs to Be Created
The project is expected to employ about 450 people.
Net Present Value/Internal Rate of Return
The project has a pretax net present value, at an 8% discount rate, of C$1.68-billion and an internal rate of return of 43.9%, with a payback of 2.5 years.
Value
Initial capital expenditure, including the mine upgrade capital cost of $157.2-million, has been estimated at C$326.8-million.
Duration
Not state.
Latest Developments
Champion Iron Ore has announced the official restart of the Bloom Lake mine only 19 months after acquiring the mothballed high-grade iron-ore asset.
Key Contracts and Suppliers
None stated.
On Budget and on Time?
Not stated.
Contact Details for Project Information
Champion Iron VP corporate secretary (Canada) Jorge Estepa, tel +1 416 866 2200 or email jestepa@championiron.com.
Comments
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation