https://www.miningweekly.com

Bligh targeting early production from Bundarra

2nd September 2015

By: Esmarie Iannucci

Creamer Media Senior Deputy Editor: Australasia

  

Font size: - +

PERTH (miningweekly.com) – ASX-listed junior Bligh Resources has inked a joint venture (JV) agreement over its Bundarra gold project, in Western Australia, which could result in the project moving into production within 18 months.

Under a memorandum of understanding with privately owned Angler Mining, Angler would fund a feasibility study into the Bundarra project and would cover the cost to secure approval for the project, in return for a 50% shareholding in Bundarra.

Angler would also pay a A$25 000 up-front consideration to Bligh and a further A$200 000 by November 14, to allow Bligh to redeem its convertible notes held by Terrain Minerals.

Angler would subscribe for a further A$250 000 worth of Bligh shares through a private placement, some 45 days within signing a JV agreement

In addition, Angler’s wholly-owned subsidiary Contained Gold would fund, build, own and operate the plant that would treat the Bundarra ore.

The proposed plant would have a capacity of between 300 000 t/y and 500 000 t/y and would contain a milling facility that would be used exclusively to treat Bundarra ore, with operating costs during the production period to be jointly funded by the JV partners.

Angler MD Dean O’Keefe on Wednesday said the company’s strategy was to use abundant in-house industry experience to identify and partner with quality asset owners to develop projects.

“We are targeting opportunities where a project is too small or early-stage for the majors to buy or for a smaller company to secure funding, but at the same time, it has the ability to generate strong cash flow if developed and managed well on a smaller scale.”

O’Keefe said the opportunity presented at Bundarra met this criteria.

The project is some 70 km north of Leonora and contains a measured and indicated resource of 244 000 oz of gold, grading 2.1 g/t gold and an inferred resource of 182 000 oz, at 1.78 g/t gold.

Bligh and Angler were hoping to extract ore from the bottom of the existing Celtic, Wonder North and Wonder West pits, while simultaneously testing for resource extensions in the area.

Edited by Chanel de Bruyn
Creamer Media Senior Deputy Editor Online

Comments

Showroom

Actom image
Actom

Your one-stop global energy-solution partner

VISIT SHOWROOM 
GreaseMax
GreaseMax

GreaseMax is a chemically operated automatic lubricator.

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Resources Watch
Resources Watch
17th April 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.145 0.182s - 90pq - 2rq
1:
1: United States
Subscribe Now
2: United States
2: