https://www.miningweekly.com

Bisie tin project, Democratic Republic of Congo

27th October 2017

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Bisie tin project.

Location
The project is located in the Mpama North prospect, in North Kivu province, in the Democratic Republic of Congo (DRC).

Client
The Bisie tin project is 82.5%-owned through Alphamin Resources’ DRC registered subsidiary ABM SA; 5%-owned by the DRC government and 14.25%-owned by the Industrial Development Corporation of South Africa.

Project Description
The Bisie project contains two exceptional high-grade deposits – Mpama North and Mpama South – and is one of the highest-grade known tin deposits in the world.

The front-end engineering design (FEED) and control budget estimate (CBE) have increased proven and probable reserves from 3.52-million tonnes grading at 4.34% tin containing 152 800 t in the 2016 updated feasibility study to 4.67-million tonnes at 3.58% tin containing 167 300 t.

The life-of-mine has also been increased from 12 to 12.5 years.

The completion of the FEED programme and CBE in February this year further confirmed the robust economic metrics and potential of the project, and its development into North Kivu’s first commercial mine and a new premier global tin-producing mine.

The CBE results have illustrated the project’s potential to remain profitable at lower tin prices and increased prices for key consumables.

The fundamental mining method has not changed, but the layout and mine design parameters have changed notably from the updated feasibility study issued in June 2016.

Contractors will mine the Mpama North orebody using proven underground mechanised mining methods to deliver ore to the process plant at an expected rate of 25 000 t/m to 35 000 t/m.

The process design is based on the recovery of tin into concentrate through conventional gravity separation methods. The process plant design capacity has been estimated at between 360 000 t/y and 400 000 t/y.

Potential Job Creation
The mine has nearly 1 000 workers on site – 800 unskilled workers from the communities, up to 30% of whom are former artisanal miners – working on the development of the mine.

Net Present Value/Internal Rate of Return
The FEED and CBE have estimated a net present value, at an 8% discount rate, of $402.2-million and an internal rate of return of 49.1% after tax. Payback has been estimated at 17 months from first production.

This compares with a post-tax net present value, at a 13.54% discount rate, of $167.79-million, and an internal rate of return of 48.4%, with a payback of 23 months in the updated feasibility study.

Value
The peak funding requirement for the project has increased from $124.4-million in the updated feasibility study to $151.43-million in the CBE.

The initial capital costs include the design and development of an access road, an underground mine, the creation of a 64 000 t ore stockpile, a process plant, a tailings storage facility and all associated services required for the operation of the mine.

Duration
The company is aiming to produce its first tin concentrate during the first half of 2019.

Latest Developments
Alphamin’s Bisie tin mine is expected to reach first production in the first quarter of 2019, and steady-state production by the end of 2019.

With underground workings well under way, 2018 will mark a milestone year as the civil and earthworks and mining contractors are appointed, besides others.

The total spend on the mine to date is $9.5-million, with a further $30-million to $40-million committed for long-lead items.

By the time the mine starts production, Alphamin will have injected more than $120-million into the operation.

Key Contracts and Suppliers
Kongo River (earthworks) and Reliant Congo (mining contract).

On Budget and on Time?
Not stated.

Contact Details for Project Information
Alphamin Resources CEO Boris Kamstra, tel +230 269 4166 or email boris.kamstra@alphaminresources.com.

Edited by Creamer Media Reporter

Comments

Showroom

VEGA Controls SA (Pty) Ltd
VEGA Controls SA (Pty) Ltd

For over 60 years, VEGA has provided industry-leading products for the measurement of level, density, weight and pressure. As the inventor of the...

VISIT SHOWROOM 
Rittal
Rittal

Rittal is a world leading provider of top-quality integrated systems for enclosures, power distribution, climate control, IT infrastructure and...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Magazine round up | 19 April 2024
Magazine round up | 19 April 2024
19th April 2024
Resources Watch
Resources Watch
17th April 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.068 0.1s - 90pq - 2rq
1:
1: United States
Subscribe Now
2: United States
2: