Base reschedules Kwale debt
PERTH (miningweekly.com) – Dual-listed mineral sands miner Base Resources on Tuesday told shareholders that it has rescheduled its $215-million outstanding debt for the Kwale mineral sands project, in Kenya.
Base in November this year flagged the refinancing of its debt, saying that the current commodity market made the repayment of the project debt facilities ‘challenging’.
Under the terms of the reschedule, Base has now paid down $14-million of the debt facility on execution of the agreement, which along with the $11-million repayment made in June this year, brought the outstanding debt to $190-million.
The remaining debt would be repaid in tranches over the next four-and-a-half years, with Base allowed to lower its repayments over the next two years.
In 2016, the miner was expected to repay $9.5-million in debt, followed by an $11.4-million repayment in 2017. Between 2018 and 2020, the remaining debt would be paid off in tranches of $26.6-million.
Base’s parent guarantee would remain in place until the end of June 2017, subject to perfecting the applicable lender security package and finalising a long-term operating license for the port operations.
A margin of 0.25% would be applied to the debt until the earlier of the lender security package being perfected, and when the outstanding loan was reduced to $170-million.
A margin of 6.30% would also be applicable across all tranches.
Base started exports from Kwale in 2014 and the mine was being ramped up to produce 80 000 t/y of rutile, 360 000 t/y of ilmenite and 30 000 t/y of zircon. An optimisation push at Kwale was expected to increase the mine’s combined ilmenite, rutile and zircon output beyond 460 000 t/y.
Comments
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation