Barossa LNG project advances to FEED phase – Santos
PERTH (miningweekly.com) – Australian oil and gas major Santos and its joint venture (JV) partners have advanced the Barossa project to the front-end engineering and design (FEED) phase of development.
FEED activities will involve engineering and commercial work, aimed at finalising the project’s technical detail, cost, liquefied natural gas (LNG) sales agreements and negotiation of access arrangements with the owners of the Darwin LNG project and the Bayu-Undan to Darwin gas pipeline.
“The Barossa FEED decision consolidates its position as the leading candidate for Darwin LNG backfill when Bayu-Undan production ceases in the early 2020s,” Santos MD and CEO Kevin Gallagher said.
“It’s a great step forward for Santos because our higher equity position means that a successful Barossa development would more than double our current production out of northern Australia.”
Barossa’s development would extend the operating life of the Darwin LNG project for more than 20 years, and would help supply growing demand for natural gas in Asia, while also providing significant jobs and business opportunities in the Northern Territory, said Gallagher.
The Barossa development concept consists of a floating production, storage and offloading (FPSO) facility, six subsea production wells that will be drilled in the initial phase, supporting in-field subsea infrastructure and a gas export pipeline tied to the existing Bayu-Undan to Darwin pipeline.
A final investment decision on the project is targeted towards the end of 2019, with contracts for field surveys and engineering for the FPSO, subsea facilities and export pipeline to be awarded soon.
The Barossa gasfield, some 300 km north of Darwin, lies within Santos’ Northern Australia portfolio. Santos holds a 25% interest in the Barossa-Caldita JV, along with partners ConocoPhillips and SK E&S.
Comments
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation