https://www.miningweekly.com

Balla Balla iron-ore export facility project, Australia

27th January 2017

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Balla Balla iron-ore export facility project.

Location
Pilbara, Australia.

Client
The Balla Balla Infrastructire Group (BBIG), which is 90%-held by Todd Corporation.

Project Description
The project involves the construction of a railway line and a conveyor system to link the Pilbara iron-ore project (PIOP), developed by Flinders Mines, with the proposed Balla Balla infrastructure port (BBIP). This will include the construction of:
• an estimated 40 km overland conveyor from the PIOP conveyor-feed chute to the Balla Balla infrastructure railway (BBIR) stockyard;
• the BBIR stockyard;
• an estimated 160 km railway line from the BBIR stockyard to the BBIP stockyard;
• the BBIP stockyard and conveyor;
• a borrow pit; and
• associated infrastructure and services, including external access roads, communication towers and reticulated services, water supply and pipelines, accommodation camps, a workshop and laydown areas, a ballast quarry, a power supply and a landfill.

The export facility will be capable of handling between six-million and ten-million tonnes of iron-ore a year.

Jobs to be Created
The project will create 3 300 jobs during construction and 910 jobs once operational.

Net Present Value/Internal Rate of Return
Not stated.

Value
A$5.6-billion.

Duration
Construction is expected to start in the fourth quarter of 2015, with construction expected to take place over 18 months.

Latest Developments
The Western Australian government has committed to a state agreement with BBIG. “This state agreement includes a requirement for local industry participation and community development plans to be submitted to the government for approval, maximising the benefits of the project for West Australians,” Premier Colin Barnett has said.

The proposed export facility will use custom-built barges to transfer ore onto ships, reducing costs and environmental impacts, he has added.

Key Contracts and Suppliers
None stated.

On Budget and on Time?
Too early to state.

Contact Details for Project Information
Todd Minerals, tel + 64 4 472 2970 or email enquiries@toddcorporation.com.
 

Edited by Creamer Media Reporter

Comments

Projects

Showroom

SAIMC (Society for Automation, Instrumentation, Mechatronics and Control)
SAIMC (Society for Automation, Instrumentation, Mechatronics and Control)

Education: Consulting with member companies to obtain the optimal benefits from their B-BBEE spending, skills resources as well as B-BBEE points

VISIT SHOWROOM 
Showroom image
Alcohol Breathalysers

Supplier & Distributor of the Widest Range of Accurate & Easy-to-Use Alcohol Breathalysers

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.103 0.14s - 90pq - 2rq
1:
1: United States
Subscribe Now
2: United States
2: