Azumah extends Ghana project's expected mine life, output
PERTH (miningweekly.com) – An updated feasibility study into the Wa gold project, in Ghana, has seen an increase in expected production and mine life, ASX-listed Azumah Resource reported on Monday.
Based on an inventory of 652 500 oz of gold, the Wa project was expected to deliver an average of 90 000 oz/y of gold, over a mine life of seven years.
This was compared with the production estimate of 74 000 oz/y, and a mine life of six years, estimated in the 2012 feasibility study.
The updated feasibility study estimated that the project would require a capital injection of about A$168-million, compared with the A$144-million estimated in 2012, with C1 cash operating costs over the mine life decreasing from the previous estimate of A$802/oz to A$697/oz.
“Provisional study results confirm a solid project with no technical, social or environmental impediments to development, improved fundamentals such as mine life, ore-grade and strip ratio, plus operating and capital costs in line with, if not better than, guidance provided when the ore reserves were issued last year,” said Azumah MD Stephen Stone.
He noted that the existing two-million-ounce mineral resource highlighted that any further reductions in operating costs would translate to enlarged pits and higher gold production.
“Recent exploration results confirm the 2 800 km2 project’s underlying prospectivity and underpin our confidence that we will continue to increase mineral resources, convert these to ore reserves, and increase mine life.”
Additional work was planned to enhance overall returns at the Wa project, including a review of the operating costs to lift mineral resource to reserve conversion, a review of the plant configuration options to reduce operating costs, the continuation of exploration and government engagement regarding region-specific and other concessions to reduce capital and operating costs.
Comments
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation