GOLD 1280.70 $/ozChange: 5.75
PLATINUM 1422.50 $/ozChange: 2.30
R/$ exchange 10.71Change: 0.03
R/€ exchange 14.21Change: 0.03
 
We have detected that the browser you are using is no longer supported. As a result, some content may not display correctly.
We suggest that you upgrade to the latest version of any of the following browsers:
         
close notification
powered by
Advanced Search
 
 
 
Home
 
Sector News
 
PGM
 
 
 
Anglo Platinum Converting Process (ACP) Project, Rustenburg
PRINT
 
 
Embed Code Close
content
 
5th April 2002
TEXT SIZE
Text Smaller Disabled Text Bigger
 
Name and location Anglo Platinum Converting Process (ACP) Project, Rustenburg Project description The ACP project is designed to reduce sulphur dioxide emissions from 130 t/d to less than 20 t/d the Waterval Smelter complex in Rustenburg significantly and increase converting capacity. The plant incorporates new worldwide trends in smelter technology.

Value R1,45-billion Duration Scheduled for completion in 2004.

Description of main contracts Main components of the plant include six-in-line furnace, flash drier, dewatering and drying plant, acid plant, converter matte feed, raw material handling plant, slow cool plant, slag granulation and slag clean furnace equipment, slag mole and flotation plant and furnace gas cleaning area.

Client Anglo Platinum Latest development All major contracts have been awarded and the project is on target to meet scheduled completion of phase 1 in 2002 and phase 2 in 2004.

Participants Unstated On budget and on time Yes.

Contact details for project information Anglo Platinum, Tel (011) 373 6111
 

To subscribe to Mining Weekly's print magazine email subscriptions@creamermedia.co.za or buy now.