Adani gives go-ahead for $16.5bn coal mine in Queensland
PERTH (miningweekly.com) – Indian major Adani has pulled the trigger on the $16.5-billion Carmichael coal and rail project, in Queensland, announcing a positive final investment decision (FID) just days after striking a tax deal with the state government.
“I am proud to announce the project has FID approval which marks the official start of one of the largest single infrastructure and job creating developments in Australia’s recent history,” said Adani chairperson Gautam Adani on Tuesday.
“This is the largest single investment by an Indian corporation in Australia, and I believe others will follow with investments and trade deals. We have been challenged by activists in the courts, in inner city streets, and even outside banks that have not even been approached to finance the project.
“We are still facing activists, but we are committed to this project,” Adani said.
Adani on Tuesday also signed letters of award for the design, construction, operations, supply of materials and professional services, with the largest of these contracts going to Downer Mining for the construction and operation of the Carmichael mine.
The Indian firm previously awarded an A$82-million contract to Rockhampton-based Austrak for the supply of concrete sleepers for the Carmichael project, and a A$74-million contract with Arrium Mining and Materials for the supply of about 54 000 t of railway tracks.
The company has now also inked a contract for the Carmichael rail network, linking the Galilee basin mines to the port of Abbot Point.
Adani head of country and CEO Jeyakumar Janakaraj said the transaction with AECOM would include surveying and design for the rail link.
“We are building more than a rail line,” Janakaraj said.
“We are building a line that will open the Galilee basin, linking that massive coal reserve to markets around the world, generating power, and – importantly – generating many thousands of direct and indirect jobs in regional Queensland.
“In Adani’s case, it will link its Carmichael coal mine to our bulk loading facility at the Port of Abbot Point from where it will be shipped to Adani’s power stations in India.”
The Carmichael coal, railway and port project includes building Australia’s largest thermal coal mine producing some 60-million tonnes a year over a 90-year mine life, linked by a new 388 km standard gauge rail line to a new terminal at Abbot Point port near Bowen.
Comments
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation