https://www.miningweekly.com

Samapleu-Grata nickel/copper project, Côte d'Ivoire

10th May 2024

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Samapleu-Grata nickel/copper project.

Location
Western Côte d’Ivoire.

Project Owner/s
Ivanhoe Electric (60%) and Sama Resources (40%).

Project Description
The 2024 preliminary economic assessment (PEA) outlines the potential for a conventional openpit mining operation supporting 86.5-million tonnes of modelled mill feed, together with 1.62-million tonnes of direct shipped laterite material entirely from the Grata, Main and Extension deposits, and the Sipilou Sud Laterite deposit.

Over the 16-year life-of-mine, the project is forecast to produce an average of 38 627 t/y of a 26% copper concentrate and 55 119 t/y of a 13% nickel concentrate through a process plant with a capacity of 5.5-million tonnes a year. 

This will be achieved through a conventional process that focuses on flotation to produce separate copper and nickel concentrates, together with cobalt, platinum, palladium and gold as by-products.

Average nickel metal in concentrate of about 7 165 t/y and copper metal in concentrate of about 10 043 t/y is envisaged.

The PEA covers only the Grata, Main and Extension deposits, and the Sipilou Sud Laterite deposits, which together with the proposed mine infrastructure, covers only about 3% of the 835 km2 project area. 

This provides ample opportunities for exploration upside and expansion opportunities, including at the known mineralised zones at Yepleu and Draba.

The polymetallic nature of the Samapleu-Grata project means that it has the potential to produce not only a nickel concentrate but also a high-quality 26% copper concentrate that is on par with the copper concentrate produced from primary copper mines.

Potential Job Creation
Not stated.

Net Present Value/Internal Rate of Return
The PEA estimates a pretax net present value of $463-million at an 8% discount rate and an internal rate of return of 28.2%, with an after-tax payback of 3.8 years.

Capital Expenditure
Initial capital costs are estimated at $338-million, including a contingency of $61-million.

Planned Start/End Date
Not stated.

Latest Developments
None stated.

Key Contracts, Suppliers and Consultants
None stated.

Contact Details for Project Information
Ivanhoe Electric investors, tel +1 480 656 5821 or email info@ivanhoeelectric.com.
 

Edited by Martin Zhuwakinyu
Creamer Media Senior Deputy Editor

Comments

The content you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION