https://www.miningweekly.com
Construction|Crushing|Excavators|Gold|Installation|Mining|PROJECT|Resources|Services|Storage|Trucks|Water|Welding|Operations
Construction|Crushing|Excavators|Gold|Installation|Mining|PROJECT|Resources|Services|Storage|Trucks|Water|Welding|Operations
construction|crushing|Excavators|gold|installation|mining|project|resources|services|storage|trucks|water|welding|operations

Kiaka gold project, Burkina Faso – update

Image of gold dust

17th May 2024

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Kiaka gold project.

Location
About 45 km south of West African Resources’ (WAF’s) existing Sanbrado gold mine, in Burkina Faso.

Project Owner/s
WAF (90%) and the government of Burkina Faso (10%).

Project Description
A feasibility study concluded on the project in August 2022 has indicated that Kiaka will be a low-cost gold project, averaging 219 000 oz/y of gold production over an 18.5-year mine life from 2025.

The feasibility study is based on conventional openpit mining methods, with run-of-mine ore being directly fed to the crushing circuit. Mining operations will use a combination of 140 t and 230 t hydraulic excavators, complemented by 95 t dump trucks.

Kiaka’s free-milling gold ore will be processed through a conventional single-stage gyratory crushing and semiautogenous grinding (SAG) ball mill crusher milling circuit, followed by carbon-in-leach (CIL) processing.

The process plant will have a nameplate capacity of seven-million tonnes a year.

Potential Job Creation
None stated.

Net Present Value/Internal Rate of Return
The project has a pretax net present value, at a 5% discount rate, of $1.24-billion and an after-tax internal rate of return of 21.4%, with a 3.25-year payback on preproduction capital.

Capital Expenditure
$430-million.

Planned Start/End Date
Major works are scheduled from early 2023, with first gold expected in 2025.

Latest Developments
WAF has made significant progress on the project as construction continues to advance on the 219 000 oz/y operation.

The company is nearing completion of a water storage dam and bulk earthworks for a mining services area.

WAF has started with CIL tank welding and bulk earthworks for a tailings storage facility, while its SAG mill has arrived on site for installation.

Key Contracts, Suppliers and Consultants
None stated.

Contact Details for Project Information
WAF, tel + 61 8 9481 7344 or email info@westafricanresources.com.

Edited by Creamer Media Reporter

Comments

Showroom

Weir Minerals Africa and Middle East
Weir Minerals Africa and Middle East

Weir Minerals Europe, Middle East and Africa is a global supplier of excellent minerals solutions, including pumps, valves, hydrocyclones,...

VISIT SHOWROOM 
SAIMC (Society for Automation, Instrumentation, Mechatronics and Control)
SAIMC (Society for Automation, Instrumentation, Mechatronics and Control)

Education: Consulting with member companies to obtain the optimal benefits from their B-BBEE spending, skills resources as well as B-BBEE points

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Magazine round up | 31 May 2024
Magazine round up | 31 May 2024
31st May 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.23 0.286s - 92pq - 2rq
1:
1: United States
Subscribe Now
2: United States
2: